A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750.
Which action allows the most efficient use of existing equipment?()
A.Populate the Power 750 first then add a GX+ adapter to support PCI-X andPCIe I/O drawer loops.
B.Populate the Power 750 first then add 2 GX+ adapters to support PCI-X andPCIe I/O drawer loops.
C.Populate the Power 750 first then add a GX++ adapter to support PCI-X andPCIe I/O drawer loops.
D.Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X andPCIe I/O drawer loops.
您可能感興趣的試卷
你可能感興趣的試題
A.PowerVM offers partition mobility.
B.PowerVM can virtualize network and SAN resources.
C.PowerVM supports multiple operating systems running concurrently.
D.PowerVM allows an LPAR to use activated cores and memory without limitation.
A company plans to deploy a two-enclosure, 23-core Power 780 system with AIX, IBM i and Linux in thefollowing configuration: 3 AIX partitions with dedicated network and disk adapters; 1 native IBM i partition acting as a host1 hosted IBM i partition; 2 hosted Linux partitions.
Which configuration will provide boot disk capability to all partitions?()
A.Use dual-split backplane in both enclosures for the three AIX partitions and the IBMi partition.
B.Put each partition on a dedicated controller using the triple-split backplane option in both enclosures.
C.Use the triple-split backplane option in one enclosure for the AIX partitions, and the default dual-split backplane for the IBMi partition in the second enclosure.
D.Use the triple-split backplane option in one enclosure for the AIX partitions, and the non-split backplane mode in the second enclosure for the IBMi hosting partition.
A.Configure 2CFFh combination fibre channel / gigabit Ethernet adapters
B.Configure 1CFFh 2-port fibre channel adapter and 1 CIOv 2-port gigabit Ethernet adapter
C.Configure 1CIOv 2-port fibre channel adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapter
D.Configure 1CIOv 2-port gigabit Ethernet adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapter
Using the following information: Performance data from an existing system that a new system will replace; Performance estimates that anticipate future workloads; Micro-partitioning and logical partitioning implementations.
Which of the following allows a technical sales representative to create a system design which can be imported into an HMC?()
A.IBMeConfig
B.IBM Performance Monitor
C.IBM Workload Estimator (WLE)
D.IBM System Planning Tool (SPT)
A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage.
Which system software solution component supports the customer requirement?()
A.PowerHA SystemMirror Basic Edition
B.PowerHA SystemMirror Express Edition
C.PowerHA SystemMirror Standard Edition
D.PowerHA SystemMirror Enterprise Edition
最新試題
Which of the following configuration is valid for expansion drawers on a Power 750 with 2 processor board sinstalled?()
A customer is implementing a POWER Blade solution which requires the VIO Server to be mirrored on internal disk drives. Which Blade supports the requirement?()
Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager (AEM) in a data center with high energy utilization?()
A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()
A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage.Which system software solution component supports the customer requirement?()
A customer is evaluating PowerVM and VMware to run a data warehouse application. Which feature of PowerVM should be highlighted as a differentiator?()
A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()
A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs.How can they manage the new machines for the least cost?()
A POWER7 processor has L1, L2 and L3 caches. Which of the three caches uses embedded DRAM (eDRAM) technology?()
Which of the following has an integrated database?()