A.secure the electric supply
B.ventilate area to remove smoke
C.start the fire pump and lead out hose
D.apply foam
您可能感興趣的試卷
你可能感興趣的試題
A.the circuit being worked on and the location of all switches and circuit breakers controlling it
B.first-aid techniques for treating electrical shock
C.cardiopulmonary resuscitation (CPR)
D.All of the above
A.week
B.2 weeks
C.month
D.3 months
A.De-energize the applicable switchboard bus
B.Bypass the interlocks
C.Secure and tag the supply circuit breaker in the open position
D.Station a man at the circuit supply switch
A.Wear rubber gloves and boots
B.Use only approved non-conducting tools
C.Ground the case of the machine before beginning any repairs
D.Open the supply circuits and tag the switches
A.electromagnetic field, revolving armature type
B.electromagnetic field, oscillatory armature type
C.armature, oscillatory electromagnet field type
D.armature, rotating electromagnetic field type
最新試題
Which of the following items don’t belong to dock repair works?()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
The shipboard oil pollution emergency plan will be invalid after ()
The condensers located in various stages of a flash evaporator are cooled by()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
() is not installed on the main switchboar.
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()