A.main switchboard
B.engine room bilge
C.breathing compartment
D.electric fresh water transfer pump
您可能感興趣的試卷
你可能感興趣的試題
A.one year from the date of issue
B.two years from the date of issue
C.three years from the date of issue
D.four years from the date of issue
A.IMO
B.CCS
C.USCG
D.PICC
A.is drilling on the Outer Continental Shelf
B.moves to a new drilling location in U-Swaters
C.engages in a voyage to a port of another country which is a party of MARPOL
D.All of the above
A.transmitting the heat of a fire through the ships metal
B.burning liquids flowing into another space
C.heated gases flowing through ventilation systems
D.the transfer of heat across an unobstructed space
A.to starboard
B.to port
C.forward
D.aft
最新試題
() is not installed on the main switchboar.
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Using a file without a handle may result in ()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
The ISPS Code consists of a mandatory section-Part A, which shows()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
If separating effect is not good, which measure should be taken ()