A.Shutting off electricity to damaged cables
B.Pumping fire-fighting water overboard
C.Maneuvering the vessel so the fire is on the lee side
D.Removing burned debris from the cargo hold
您可能感興趣的試卷
你可能感興趣的試題
A.ammonia
B.rotten eggs
C.gasoline
D.None of the above
A.a representative of the Captain of the Port
B.the operator of the vessel or facility
C.a representative of the National Cargo Bureau
D.low inert gas temperature
A.cargo pump failure
B.blower failure
C.deck seal low water level
D.low inert gas temperature
A.150 millimeters of water pressure
B.125 millimeters of water pressure
C.100 millimeters of water pressure
D.75 millimeters of water pressure
A.apply straw or sawdust on the oil
B.contain the spread of the oil
C.throw grains of sand into the oil
D.have the vessel move out of the spill area
最新試題
The deck water seal of the inert gas system().
The purpose of the deck seal in an inert gas system is to prevent().
What action must be taken when an individual cargo tank is closed off from the inert gas system by the tank isolation valve?()
The component in an inert gas system used for cleaning the gas of solid and sulphur combustion products,while simultaneously cooling the inert gas,is called the().
Hoses used for cargo transfer operations must be tested and inspected at specified intervals by().
Regulations require that cargo tanks carrying grades D or E liquids on tank barges be vented with().
Sour crude oil().
Inerting means().
According to the Chemical Data Guide,which reactive group(s) is/are not compatible with the products polybutene and o-xylene? ()
During loading and discharging operations,in addition to when the cargo tanks have been properly filled,each inert gas system must be capable of maintaining a minimum gas pressure of().