A.1 minute
B.3 minutes
C.5 minutes
D.10 minutes
您可能感興趣的試卷
你可能感興趣的試題
A.a subsequent temperature rise will cause the cargo to overflow
B.air pockets may cause the cargo to bubble out of the ullage hole
C.the increased viscosity of the product requires higher loading pressure which increases the chances of a spill
D.the tank valve may be stiff and a spill will occur before the valve can be closed
A.as it warms up it becomes heavier than air
B.the way it reacts with sea water
C.the strong odor it produces
D.its low temperature causes frostbite or freezing
A.the introduction of inert gas into a tank with the object of reducing the oxygen content to below 8% by volume
B.the introduction of inert gas into a gas free tank for the purpose of reducing the oxygen content to below 8% by volume
C.the introduction of inert gas into a cargo tank during cargo discharge to replace the volume of discharged cargo
D.All of the above
A.open and individual tank valves open
B.open and the individual tank valves closed
C.closed and the individual tank valves closed
D.closed and the individual tank valves open
A.Shutting off electricity to damaged cables
B.Pumping fire-fighting water overboard
C.Maneuvering the vessel so the fire is on the lee side
D.Removing burned debris from the cargo hold
最新試題
Upon arrival at the discharging port,the inert gas system is().
Petroleum cargo tanks should not be topped off at deck level when loading on a cold day because().
According to the Chemical Data Guide,which reactive group(s) is/are not compatible with the products polybutene and o-xylene? ()
Releasing oil from the sea anchor of a survival craft may().
If a leak occurred while loading diethylenetriamine,the chemical data guide indicates you would smell an odor similar to().
According to the Chemical Data Guide,1,3 - pentadiene possesses which characteristic? ()
During loading and discharging operations,in addition to when the cargo tanks have been properly filled,each inert gas system must be capable of maintaining a minimum gas pressure of().
Using an inert gas system on a tanker has which advantage(s)? ()
Each inert gas system gas main must have an automatic shut down valve at the outlet of the gas production plant. This valve must close automatically upon().
Reid vapor pressure is().