單項選擇題In order to correctly open a new coil of manila line,you should().

A.pull the tagged end from the top of the coil
B.pull the tagged end through the eye of the coil
C.secure the outside end and unroll the coil
D.unreel the coil from a spool


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題If your vessel has a list to port due to negative GM and off-center weight,the first corrective measure you should take is to().

A.move port-side main-deck cargo to the starboard side
B.fill the starboard double-bottom
C.pump water from the port double-bottom to the starboard double-bottom
D.pump water from the port double-bottom over the side

2.單項選擇題If two mooring lines are to be placed on the same bollard,which method is BEST?().

A.Place the eye from the forward line on the bollard and then place the eye from the second line directly over the first
B.It makes no difference how the lines are placed
C.Place the eye from either line on the bollard,and then bring the eye of the other line up through the eye of the first,and place it on the bollard
D.Place both eyes on the bollard,in any manner,but lead both lines to the same winch head on the vessel and secure them on the winch

3.單項選擇題If the goods shipped are perishable,low cost goods,live animals,deck cargo,etc.,the freight and all related charges shall be paid().

A.at the time of shipment
B.on vessel's arrival
C.at the time of sailing
D.at the time the voyage has been accomplished

4.單項選擇題How is the size of chain determined?().

A.Length of link in inches
B.Diameter of metal in link in inches or centimeters
C.Links per fathom
D.Weight of stud cable in pounds

5.單項選擇題Freeing ports on a vessel with solid bulwarks().

A.prevent stress concentration in the bulwark
B.permit easy jettison of deck cargo in an emergency
C.provide openings through the bulwarks for mooring lin
D.allow water shipped on deck to flow off rapidly