A.satisfied engineers
B.qualified ratings
C.satisfied chief engineer
D.qualified chief engineer
您可能感興趣的試卷
你可能感興趣的試題
A.ship-owner’s
B.master’s
C.chief engineer’s
D.manager’s
A.the SOLAS Convention
B.the MARPOL Convention
C.the STCW Convention
D.the LIAD LINE Convention
A.Absence, substantial deterioration or failure of proper operation of the cargo deck area fire protection on tanker
B.Absence, non-compliance or serious deterioration of lights, shapes or sound signal
C.Absence or failure of proper operation of the radio equipment for distress and safety communication
D.Absence in a watch of a person qualified to operate equipment essential to safe navigation, safety radio communications or the prevention of marine pollution
A.Failure of proper operation of propulsion and other essential machinery, as well as electrical installation
B.Failure of the proper operation of the main and auxiliary steering gear
C.Failure of engineering watch arrangements to confirm to the requirements specified for the ship by Administration
D.Failure of the proper operation of emergency generator, lighting, batteries and switches
A.trim
B.lean
C.draft
D.tonnage
最新試題
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
The ISPS Code consists of a mandatory section-Part A, which shows()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
The shipboard oil pollution emergency plan will be invalid after ()
Diesel engine air start system check valves are opened by ()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
Using a file without a handle may result in ()