A.STCW78
B.STCW95
C.SOLAS74
D.SOLAS88
您可能感興趣的試卷
你可能感興趣的試題
A.six months
B.one year
C.three year
D.five years
A.in any emergency or if in any doubt as to what decision or measures to take
B.in the event of any impending action in machinery spaces that may cause reduction in ship’s speed
C.when isolating and bypassing machinery to be worked on
D.co-operating with any engineer in charge of maintenance work
A.the chief engineer
B.the designated engineer from shipyard
C.the designated duty officer in charge of the engineering watch
D.the designated surveyor from classification society
最新試題
Flame failure in an automatically fired auxiliary boiler can from a/an ()
Cold weather starting of a diesel engine may be made easier by()
The shipboard oil pollution emergency plan will be invalid after ()
Which of the following items don’t belong to dock repair works?()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
To proceed to the assistance of a ship in distress is()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.