A.viscosity
B.pour point
C.volatility
D.lower explosive limit
您可能感興趣的試卷
你可能感興趣的試題
A.3 years after making the first entry
B.2 years after the last entry
C.3 months after last entry
D.3 years after the last entry
A.safety regulations
B.technical regulations
C.minimum requirements
D.standard requirements
A.STCW78
B.STCW95
C.SOLAS74
D.SOLAS88
A.six months
B.one year
C.three year
D.five years
When the ship is in restricted visibility, the officer in charge of the engineering watch shall ensure that ()
Ⅰ.Bridge order relating to changes in speed or direction of operation areimmediately implemented
Ⅱ.auxiliary machinery used for maneuvering is readily available
Ⅲ.permanent air or steam pressure is available for sound signals
A.Ⅰ+Ⅱ
B.Ⅰ+Ⅲ
C.Ⅱ+Ⅲ
D.Ⅰ+Ⅱ+Ⅲ
最新試題
Which of the following items don’t belong to dock repair works?()
The treatment of the fuel oils involves storage, heating, filtering and()
The cetane rating of diesel fuel is an indication of the ()
The main purpose of port State control is not to()
Diesel engine air start system check valves are opened by ()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
The ISPS Code consists of a mandatory section-Part A, which shows()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
Under MARPOL Code the ship to which it applies has to carry ()