A.severe electrical storm
B.fire on the pier
C.fire on the ship
D.any of the above
您可能感興趣的試卷
你可能感興趣的試題
A.1% to 3%
B.1% to 2%
C.4%
D.2% to 4%
A.bunker at a normal rate
B.check for kinks in hose
C.close valves slowly
D.shut valves before topping off
A.lining up the systems
B.topping off
C.starting delivery
D.connecting hoses and joints
A.draft of the vessel
B.rate of delivery
C.communication with terminal personnel
D.observation of manifold valves
A.be safe if mixed with fresh water
B.prevent seasickness
C.promote urine excretion
D.protect against heat cramps
最新試題
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
If separating effect is not good, which measure should be taken ()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
Cold weather starting of a diesel engine may be made easier by()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()