A.Tow position
B.Proportional
C.Reset
D.Rate
您可能感興趣的試卷
你可能感興趣的試題
A.the ISM Code
B.the ISPS Code
C.the IBC Code
D.the IGC Code
A.English, French or Spanish
B.Chinese, English or French
C.English, French or Japanese
D.Chinese, English or Spanish
A.six months
B.two years
C.four years
D.five years
A.the chief engineer officer
B.the master of the ship
C.the manager of the company
D.the Administration
A.bridge log
B.Master’s log
C.engine room log
D.oil record book
最新試題
The cetane rating of diesel fuel is an indication of the ()
Which of the following items don’t belong to dock repair works?()
Under MARPOL Code the ship to which it applies has to carry ()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
Using a file without a handle may result in ()
Diesel engine air start system check valves are opened by ()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The condensers located in various stages of a flash evaporator are cooled by()