A.Excessive wear
B.Scuffing of the liner
C.Piston seizure
D.All of the above
您可能感興趣的試卷
你可能感興趣的試題
A.diametrical tension
B.gap clearance
C.radial thickness
D.face thickness
A.install oversized rings
B.hone the cylinder liner to allow ring installation
C.compress the rings tighter with a compressing tool
D.file the ends of the rings
A.jam in the most worn part of the cylinder when the rings expand
B.break in the most worn part of the cylinder when the rings expand
C.wear eccentrically on the side opposite the end gap
D.overheat and jam at the top center on the combustion stroke
A.prevent governor surging at shutdown
B.make sure the fuel nozzles are flushed clean
C.prevent pressure buildup in the fuel lines
D.prevent damage from localized overheating
A.stop the combustion air supply
B.engage the jacking gear
C.secure the lube oil pump
D.shut off the fuel at the day tank
最新試題
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Under MARPOL Code the ship to which it applies has to carry ()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
The shipboard oil pollution emergency plan will be invalid after ()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
() is not installed on the main switchboar.
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
The cetane rating of diesel fuel is an indication of the ()
Using a file without a handle may result in ()