A.loading
B.leaving
C.arriving
D.sailing
您可能感興趣的試卷
你可能感興趣的試題
A.booster pump coming on the line and discharging properly
B.booster pump failing to start
C.booster pump being lined up in the wrong direction
D.ship's pump speeding up
A.arranging cargo
B.shipping cargo
C.cargo handling
D.weighing cargo
A.spilling
B.leaking
C.dumping
D.All of the above
A.flat
B.up
C.upright
D.vertical
A.moors
B.moor
C.is moored
D.mooring
最新試題
How should you signal the crane operator to move slowly().
Which operation may cause the pressure in an inert tank to fall below the prescribed limits().
Official draft measurements should be()by authorized persons,agreed by both parties involved.
Which statement comparing a shipboard crane to conventional gear is TRUE().
Sudden starts or stops of the boom is likely to cause all of the following except().
Pedestal cranes have limit switches to restrict movement of which function(s)().
Damage by()shall not be considered as handling damage.
When instructing a crew member concerning the right way to lift a weight,you would instruct him to().
The net productivity per gang-hour can be improved through a decrease of().
Which part provides for transverse control and positioning of a boom in a conventional yard and stay system().