A.Loading
B.Discharging
C.Crude oil washing
D.Steaming tanks
您可能感興趣的試卷
你可能感興趣的試題
A.A centerline crane can never be operated in tandem
B.One crane is able to work one end of two adjacent hatches
C.These cranes are more economical and weigh less than outboard-mounted cranes
D.One crane is able to work both sides of the ship
A.The cranes may be operated independently
B.The cranes may be interconnected for twin operation
C.When twinned,the crane rotation on the foundation assembly is unlimited
D.All of the above
A.The cranes may be operated independently
B.The cranes may be interconnected for twin operation
C.The cranes are powered by independent internal combustion power units
D.All of the above
A.Lock the turbine rotor and slowly bleed in steam until operating temperature is reached
B.Run the pump at high speed with the discharge valves closed
C.Run the turbine at slow speed with the pump disconnected
D.Shut the discharge valve and run the pump at slow speed
A.The loading dock
B.The midpoint of the barge
C.Within 25 feet of the pump engine
D.Above the forward rake end
最新試題
Where is the most probable location of the remote shutdown station for cargo pumps on a tank barge carrying oil().
Which of the following statement(s)is/are TRUE regarding a twin pedestal crane set().
When instructing a crew member concerning the right way to lift a weight,you would instruct him to().
Which part of a conventional cargo gear rig provides for vertical control and positioning of a boom().
When discharging oil from an oil tanker the instantaneous rate()60 liters per nautical mile.
How should you signal the crane operator to hoist().
Most pedestal crane power is provided by().
When discharging an oil cargo,the first consideration is to().
What does “evel-luffing” accomplish during crane operations().
Which statement is TRUE concerning the placard entitled Discharge of Oil Prohibited().