A.Megohm meter, insulation light and synchroscope
B.Synchroscope, synchro light and megohm meter
C.Shore power switch, insulation light and synchroscope
D.Megohm meter, insulation light and shore power switch
您可能感興趣的試卷
你可能感興趣的試題
A.Paralleling panel
B.Load panel
C.Emergency generator control pane
D.Main generator control pane
A.load panel
B.emergency generator control panel
C.battery changing and discharging panel
D.paralleling panel
A.save network cost
B.improve the reliability of supplying power to important load
C.prevent sequence reverse
D.increase the power factor of important load
A.Ammeter and changeover switch
B.Power factor meter
C.Synchroscope
D.Reverse sequence relay
A.Control panel
B.Load panel
C.Paralleling panel
D.Busbar
最新試題
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
Under MARPOL Code the ship to which it applies has to carry ()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
() is not installed on the main switchboar.
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
The main purpose of port State control is not to()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()