A.Hydraulic drive systems
B.Electric drive systems
C.Steam drive systems
D.Man-powered drive systems
您可能感興趣的試卷
你可能感興趣的試題
A.a master controller or switchbox
B.a group of relays
C.contactors
D.a solenoid brake
A.one meter from the tank bottom and one meter below the tank top
B.one half the ullage of the tank and one meter below the tank top
C.one half the ullage of the tank and one meter above the tank bottom
D.at three meter intervals from the tank top
A.winch speed
B.boom strength
C.load radius
D.cable strength
A.discharging
B.recircling
C.loading
D.taking in
A.one meter from the tank bottom and one meter below the tank top
B.one half the ullage of the tank and one meter below the tank top
C.one half the ullage of the tank and one meter above the tank bottom
D.at three meter intervals from the tank top
最新試題
How should you signal the crane operator to hoist().
Where is the most probable location of the remote shutdown station for cargo pumps on a tank barge carrying oil().
Damage by()shall not be considered as handling damage.
Which of the following statement(s)is/are TRUE regarding a twin pedestal crane set().
How should you signal the crane operator to move slowly().
Regulations concerning the stowage,lashing,and securing of timber deck cargoes aboard general cargo vessels may be found in the().
Official draft measurements should be()by authorized persons,agreed by both parties involved.
What is the purpose of the equalizing beam aboard a crane vessel().
When discharging oil from an oil tanker the instantaneous rate()60 liters per nautical mile.
If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor().