A.a master controller or switchbox
B.a group of relays
C.contactors
D.a solenoid brake
您可能感興趣的試卷
你可能感興趣的試題
A.one meter from the tank bottom and one meter below the tank top
B.one half the ullage of the tank and one meter below the tank top
C.one half the ullage of the tank and one meter above the tank bottom
D.at three meter intervals from the tank top
A.winch speed
B.boom strength
C.load radius
D.cable strength
A.discharging
B.recircling
C.loading
D.taking in
A.one meter from the tank bottom and one meter below the tank top
B.one half the ullage of the tank and one meter below the tank top
C.one half the ullage of the tank and one meter above the tank bottom
D.at three meter intervals from the tank top
A.winch speed
B.boom strength
C.load radius
D.cable strength
最新試題
When discharging oil from an oil tanker the instantaneous rate()60 liters per nautical mile.
Which statement is FALSE concerning a tagline as used with a 30-ton pedestal crane().
What does “evel-luffing” accomplish during crane operations().
They()loading at 1400 hours.
Which method should be used to warm up the pump turbines prior to discharge().
Which of the following statements is FALSE concerning cranes being installed on the centerline of vessels().
Official draft measurements should be()by authorized persons,agreed by both parties involved.
Where is the most probable location of the remote shutdown station for cargo pumps on a tank barge carrying oil().
Which operation may cause the pressure in an inert tank to fall below the prescribed limits().
How should you signal the crane operator to lower the boom and raise the load().