單項選擇題When accepting engine room spares, you should()

A.send a requisition list to the supplier
B.check that whether the items ordered have been already delivered
C.make the chief engineer on sport
D.follow a preset procedure


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題When you are asked to assist in accepting delivery of goods, you should()

A.make clear of your authority
B.make friends with ships crew
C.call the first engineer if there is a problem
D.call the master if there is a problem

2.單項選擇題Who will mainly handle the negotiation during store and spare parts transaction?()

A.Chief engineer
B.Second engineer
C.Master

3.單項選擇題Which of the followings needs not to be considered during bunkering?()

A.All scuppers plugged by carpenter
B.Tanks sounded from time to time
C.Watch kept for leakage
D.Take oil samples

4.單項選擇題Which of the followings needs not to be considered for bunkering?()

A.When to bunker?
B.Type of FO
C.Pollution prevention measures
D.Engineer to be responsible for

5.單項選擇題Which one of the following is not true according to the passage?()

A.It’s important to make clear the chain of command within the vessel
B.It is primarily your own responsibility to look after your person safety
C.The porthole is the first choice to escape when in emergency
D.all cabins are fitted with a Survival at Sea Manual

最新試題

The cetane rating of diesel fuel is an indication of the ()

題型:單項選擇題

A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()

題型:單項選擇題

The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()

題型:單項選擇題

Under MARPOL Code the ship to which it applies has to carry ()

題型:單項選擇題

Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()

題型:單項選擇題

The shipboard oil pollution emergency plan will be invalid after ()

題型:單項選擇題

During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.

題型:單項選擇題

When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish

題型:單項選擇題

The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.

題型:單項選擇題

“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()

題型:單項選擇題