A.a pipe with welded connections
B.a pipe with several clips
C.a cement box
D.a leaking valve
您可能感興趣的試卷
你可能感興趣的試題
A.make his decision independently
B.request the owner’s representative to provide proposals
C.cooperate with the flag State Administration’s representatives
D.consult the organization responsible for issuing the relevant certificates
A.prevent an unsafe ship proceeding to sea
B.prevent a ship threatening the marine environment
C.fine the ships
D.confirm a safe sailing
A.the master should be immediately informed
B.the master will be prohibited from contacting the Administration or other organization
C.he will carry out the inspection after the master be informed and be ready
D.he will carry out the inspection without informing the master
A.the PSCO’s general impression confirm a good standard of maintenance
B.the certificates are valid
C.the PSCO believes the ship doesn’t meet the requirements
D.the PSCO can’t find deficiencies at first glance
A.Survey Report File
B.Minimum Safe Manning document
C.Certificates of Competency
D.International Oil Pollution Prevention
最新試題
Under MARPOL Code the ship to which it applies has to carry ()
The shipboard oil pollution emergency plan will be invalid after ()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
The main purpose of port State control is not to()
Which of the following items don’t belong to dock repair works?()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
The treatment of the fuel oils involves storage, heating, filtering and()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()