A.Port
B.Commercial area
C.Berth
D.Roadstead
您可能感興趣的試卷
你可能感興趣的試題
A.Towing operations
B.Rigid coupled towing
C.Close coupled towing
D.Hard coupled towing
A.VTS point
B.Way point
C.Reference point
D.Establishment point
A.How long
B.How length
C.How many times
D.How many shift
A.dust
B.sea water
C.land sand
D.wind
A.In
B.On
C.To
D.For
最新試題
My ship met()heavy weather in the Indian Ocean.
()the packing is the same,the lots are different in marks.
Get everything ready()sailing.
()the time of collision,the 3rd officer was on the bridge.
I can not()you on my radar.
()will the discharging operations take?
I am proceeding()reduced speed.
I read you()single strength 5.
A SEA ROOM TO BE KEPT FOR SAFETY AROUND A VESSEL,ROCK,PLATFORM,ETC.,OR THE PLACE ASSIGNED TO A VESSEL WHEN ANCHORED OR LYING ALONGSIDE A PIER,ETC means().
Captain said that very clearly so that nobody was in any()about what was meant.