A.amount of chain lying along the bottom increases
B.length of the catenary is reduced
C.mooring line tension is increased
D.amount of chain lying along the bottom decreases
您可能感興趣的試卷
你可能感興趣的試題
A.crane pedestal
B.wire-rope locker
C.main deck
D.crane controls
A.to
B.in
C.on
D.with
A.deck edge immersion
B.the load line
C.downflooding
D.loll
A.on
B.in
C.at
D.into
A.Deck area
B.Dining room on board
C.Assembly station
D.Hold
最新試題
The lifeboats on your vessel are stowed on cradles on deck and are handled by sheath-screw boom davits. Which of the following statements about launching a boat is TRUE?()
The usual method of arranging a line on deck so that it will run out easily without kinking or fouling is().
The minimum length of a boat painter for a lifeboat in ocean service is().
The vessel or other goods upon which the Works have been carried out must be()from the Repairer’s worksite within 3 days after the invoice date or in accordance with other written notification by the Repairer to the Customer.
The Customer agrees to pay the full invoiced price,plus all other amounts payable to the()Repairer under these terms and conditions,relating to or arising out of the Works for the Customer.
You must ensure that lifesaving equipment is().
Solid waste generation,and electricity and water consumption are costly and have their own set of environmental().
The margin plate is the().
When lowering lifeboats in heavy seas,a good practice is to rig frapping lines().
What is TRUE about hoisting operations?()