A.on only the forward falls
B.on only the after falls
C.with a lead of about 45 degrees to the boat
D.from the falls to the main deck of the vessel
您可能感興趣的試卷
你可能感興趣的試題
A.Base line
B.Molded line
C.Designer's waterline
D.Keel line
A.Personnel may work beneath suspended loads,as long as they are alert and wear hard hats
B.If a suspended load with no tag begins to spin,personnel should attempt to stop the spinning if the load is within reach
C.If tag lines are used to control a suspended load,they should be secured to the deck
D.Personnel not involved in the hoisting operation should be kept clear of the transfer area
A.selected
B.collected
C.detected
D.effected
A.act of God
B.lock-out
C.strike
D.paint fire
A.Aid in casting off
B.Direct the drift of the vessel
C.Aid in its recovery
D.Maintain maximum resistance to broaching
最新試題
Which mooring line prevents sideways motion of a vessel moored to a pier().
The terms ceiling and margin plate are associated with the().
Which will cause a wire rope to fail().
You are handling a mooring line and are instructed to Check the line.What should you do().
What is TRUE about hoisting operations?()
The lifeboats on your vessel are stowed on cradles on deck and are handled by sheath-screw boom davits. Which of the following statements about launching a boat is TRUE?()
Any Works completion date quoted by the Repairer is an estimate only and the Repairer shall not be()liable for any failure to complete the Works by that date.
You must ensure that lifesaving equipment is().
Solid waste generation,and electricity and water consumption are costly and have their own set of environmental().
Which type of link is generally used to connect shots of anchor chain().