A.reduce the swinging of the lifeboat as it is being lowered from the embarkation level
B.secure the lifeboat in the davits when in the stowed position
C.hold the lifeboat to the ship's side until the tricing lines are passed
D.be used as a safety line in an emergency
您可能感興趣的試卷
你可能感興趣的試題
A.Certificate of Inspection
B.Certificate of Seaworthiness
C.Classification Certificate
D.Certificate of Registry
A.hand-propelling gear
B.a davit span with at least 2 lifelines
C.a mast and a sail
D.a motor
A.2 months
B.3 months
C.4 months
D.5 months
A.instructed in the use of portable fire extinguishers
B.shown a video demonstrating lifeboat launching
C.instructed in the use of life jackets
D.not required to attend the boat drill
A.Start each fire pump
B.Launch and run a lifeboat
C.Inventory rescue and fire equipment
D.Inspect fire hoses
最新試題
The boat command that means complete the stroke and level the oars horizontally with the blades trimmed fore and aft is().
How many life buoys()on board with self-igniting light?
How many life buoys have your ship been exactly().
On cargo and miscellaneous vessels what is NOT a required part of the fireman’s outfit?()
Frapping lines are fitted to lifeboat davits to().
Oily rags stored in a pile that is open to the atmosphere are a hazard because they may().
Fire fighting equipment requirements for a particular vessel may be found on the().
During the required periodic abandon ship drill aboard a ship,each person not assigned duties in the muster list is().
On a ship,when may a work vest be substituted for a required life preserver?()
On a ship,watertight doors should be operated().