單項(xiàng)選擇題After has permit the commissioning, the()will permit the SES access to system.

A.INMARSAT
B.IMO
C.MSC
D.CES


您可能感興趣的試卷

你可能感興趣的試題

2.單項(xiàng)選擇題The NCC is located in the().

A.IMO Headquarters in London
B.Inmarsat Headquarters building in London
C.Western European Maritime Organization
D.International Maritime Safety Committee

3.單項(xiàng)選擇題The GMDSS defines four sea area based on the().

A.location and capacity of the facilities located on board ships
B.Position and type of a sincre sintion
C.Capacity and location of shore based communication facilities
D.Position and capacity of mobile communication stations

4.單項(xiàng)選擇題The position of the POR satellite in the Inmarsat system is()above the equator.

A.55.5W
B.64.5E
C.15.5W
D.178E

5.單項(xiàng)選擇題There is actually an overlapped area of()ocean regions somewhere in Western European waters.

A.two
B.three
C.more than two
D.more than three