A.charted depth of water only
B.depth of water,including tidal differences
C.time and date of anchoring
D.type of anchor being used
您可能感興趣的試卷
你可能感興趣的試題
A.not under command
B.restricted in her ability to manoeuvre
C.restrained by her draught
D.underway
A.applying direct pressure to the wound
B.submerging the wound in lukewarm water
C.cooling the wound with ice
D.applying a tourniquet
A.a positive righting moment
B.an increase in KM
C.a negative restoring force
D.a positive restoring force
A.at high water
B.when there is a following current
C.at slack water
D.at flood
A.shorten the scope of anchor cable
B.increase the scope of anchor cable
C.put over the sea anchor
D.put over a stern anchor
最新試題
There has been a collision in sea area of Fork.().
The heaviest type pallet is the().
It was demanded that the injured crewmembers()at once.
The Coordinator Surface Search in a SAR situation should display by day().
It is good practice to use long towlines for ocean tows because the().
When a rescuer finds an electrical burn victim in the vicinity of live electrical equipment or wiring,his first step is to().
The hoist line primarily used for lifting personnel on ship cranes is called the().
In determining the scope of anchor line to pay out when anchoring a small boat,one must consider the().
If your vessel is dragging her anchor in a strong wind,you should().
What is the lifesaving signal for You are seen -assistance will be given as soon as possible?()