A.not close
B.not closing
C.not have closed
D.no closing
您可能感興趣的試卷
你可能感興趣的試題
A.by
B.with
C.on
D.in
A.for
B.by
C.at
D.in
A.with
B.from
C.on
D.by
A.has repaired
B.is being repaired
C.is repaired
D.will be repaired
A.cables
B.miles
C.kilometers
D.knot
最新試題
The mean draft of a ship is the draft().
Shipboard Emergency Drills must be carried out at least()on board cargo ship.
()is halfway between the forward and after perpendiculars and is reference point for vessel construction.
The company should establish and maintain procedures to control all documents and date which are relevant to().
Where would you find information about the time of high tide at a specific location on a particular day of the year?()
Which of the following is not an operation mode of AIS?()
Full details of all lights and fog signals are shown on().
Which wind results from a land mass cooling more quickly at night than an adjacent water area?()
()is the act of allocating space to containers on board of a container ship in the order of the discharge ports.
Berthing means bringing a vessel to her berth until().