A.Container loading
B.Container discharging
C.Stowage planning
D.Container checking
您可能感興趣的試卷
你可能感興趣的試題
A.inboard diesel engine
B.outboard diesel engine
C.outboard gasoline engine
D.inboard gasoline engine
A.the ship is made fast
B.the ship‟s first line is sent ashore
C.the ship is dredging anchor
D.the ship‟s pilot disembarks
A.determine true bearing and distance between two geographical points
B.determine magnetic compass deviation
C.transform a local datum to the WGS-'84 datum
D.convert "graphical coordinates" to "display coordinates"
A.midway between the forward and aft draft marks
B.at the center of flotation
C.at the load line
D.at the center of buoyancy
A.SOLAS
B.STCW
C.MARPOL
D.High Speed Craft Code
最新試題
The mean draft of a ship is the draft().
What is a CORRECT reply to a pilot’s request, How’s your heading?()
Full details of all lights and fog signals are shown on().
Shipboard Emergency Drills must be carried out at least()on board cargo ship.
Which of the following is not a form of precipitation?()
Bales close to the deckhead should be covered to prevent().
A tide is called diurnal when().
()is where the crew eat their meals.
()is the act of allocating space to containers on board of a container ship in the order of the discharge ports.
()is on the panel of radar.