A.a room
B.room
C.rooms
D.the room
您可能感興趣的試卷
你可能感興趣的試題
A.deep laded vessels
B.deeply load vessels
C.deep loading vessels
D.deeply loaded vessels
A.on
B.for
C.at
D.in
A.for
B.to
C.in
D.with
A.at times
B.at any time
C.at no time
D.at moment
A.funnels
B.tunnels
C.channels
D.handles
最新試題
ECDIS must be able to perform all of the following EXCEPT().
()is halfway between the forward and after perpendiculars and is reference point for vessel construction.
The company should establish and maintain procedures to control all documents and date which are relevant to().
The loading of the ship must be done in accordance with().
The ISM code is part of().
The dew point temperature is().
What is it called when it is possible to ignite the vapour above the oil?()
()is where the crew eat their meals.
The mean draft of a ship is the draft().
Your vessel is docking, but not yet alongside. Which line will be the most useful when maneuvering the vessel alongside the pier?().