A.the ship’s instructions
B.the terminal’s instructions
C.the port captain’s instructions
D.the charterer’s instructions
您可能感興趣的試卷
你可能感興趣的試題
A.great convenience
B.finding true north
C.magnetic characteristics
D.simplicity and reliability
A.A ship-to-ship mode
B.A ship-to-shore mode
C.Integrated with a vessel traffic system
D.Sending out information through broadcast automatically
A.The funnel
B.The messroom
C.The galley
D.The satellite antenna
A.synchronous rolling occurs
B.roll period decreases
C.roll period increases
D.roll amplitude is dampened
A.falling
B.rising
C.constant
D.same
最新試題
When steering by autopilot,how often should the steering be checked?()
()is halfway between the forward and after perpendiculars and is reference point for vessel construction.
ECDIS must be able to perform all of the following EXCEPT().
According to the relevant regulation, lifeboat should be powered by().
The loading of the ship must be done in accordance with().
Full details of all lights and fog signals are shown on().
The dew point temperature is().
When the wave period and the apparent rolling period are the same().
The company should establish and maintain procedures to control all documents and date which are relevant to().
The helm command PORT TWENTY means().