A.cooling
B.smothering
C.shielding of radiant heat
D.breaking the chain reaction
您可能感興趣的試卷
你可能感興趣的試題
A.directly on flames
B.at room temperature
C.in an extremely cold climate
D.None of the above
A.to right the raft if it capsizes
B.to carry the raft around on deck
C.for crewmen to hang on to
D.to hang the raft for drying
A.more
B.not so much
C.rather
D.not shch
A.anchoring
B.mooring
C.sewing
D.splicing
A.at
B.to
C.of
D.with
最新試題
A tide is called diurnal when().
The loading of the ship must be done in accordance with().
ECDIS must be able to perform all of the following EXCEPT().
Berthing means bringing a vessel to her berth until().
Which of the following is not an operation mode of AIS?()
Before any loading takes place any signs of the previous cargo should do().
According to the relevant regulation, lifeboat should be powered by().
()is halfway between the forward and after perpendiculars and is reference point for vessel construction.
Shipboard Emergency Drills must be carried out at least()on board cargo ship.
The company should establish and maintain procedures to control all documents and date which are relevant to().