A.to
B.of
C.for
D.about
您可能感興趣的試卷
你可能感興趣的試題
A.The required oily-water separator malfunctions
B.The ship is transferred to Liberian registry
C.An annual survey is conducted fifteen months after the date of certificate issuance
D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
A.chemical and physical properties of the material
B.name of the alternative standard or specification
C.the ASTM or ABS specification the material approximates
D.manufacturer or origin of the material
A.penetrations
B.plating
C.framing
D.brackets
A.examine
B.to examine
C.being examined
D.examining
A.necessity
B.responsibility
C.requirement
D.stipulation
最新試題
The annual survey for endorsement of a Load Line Certificate must be held within().
Before welding can be done in a tank that has carried petroleum products,a certificate must be obtained from().
The burden of proving unseaworthiness is upon those who()it.
The bottom of the mast rests on a part of the keel called the mast().
Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding().
The conclusion is()the said ship is fit to continue to sail.
In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the().
Cracks may be prevented from developing at the corners of welded plating inserts by().
Tensile stress is a result of two forces acting in().
I saw the cargo surveyor()the cargo on deck just a minute ago.