A.The required oily-water separator malfunctions
B.The ship is transferred to Liberian registry
C.An annual survey is conducted fifteen months after the date of certificate issuance
D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
您可能感興趣的試卷
你可能感興趣的試題
A.chemical and physical properties of the material
B.name of the alternative standard or specification
C.the ASTM or ABS specification the material approximates
D.manufacturer or origin of the material
A.penetrations
B.plating
C.framing
D.brackets
A.examine
B.to examine
C.being examined
D.examining
A.necessity
B.responsibility
C.requirement
D.stipulation
A.to windward should be opened and the ones to leeward should be closed
B.to leeward should be opened and the ones to windward should be closed
C.should be opened
D.should be closed
最新試題
The angle between the flukes and the shank of an anchor is called the().
In which case is the IOPP Certificate of an inspected vessel NOT invalidated?()
The end of the joint with the exterior threads is called the().
Cracks may be prevented from developing at the corners of welded plating inserts by().
The boom stops are installed on an offshore crane to().
The conclusion is()the said ship is fit to continue to sail.
Hatch No.1 must be cleaned up to meet the()of the cargo surveyors.
Prior to burning or welding on a fuel tank on a ship,regulations require that an inspection be made. An entry in the unofficial logbook is required if this inspection is made by().
The anchors on the bow are known as().
The bottom of the mast rests on a part of the keel called the mast().