A.chemical and physical properties of the material
B.name of the alternative standard or specification
C.the ASTM or ABS specification the material approximates
D.manufacturer or origin of the material
您可能感興趣的試卷
你可能感興趣的試題
A.penetrations
B.plating
C.framing
D.brackets
A.examine
B.to examine
C.being examined
D.examining
A.necessity
B.responsibility
C.requirement
D.stipulation
A.to windward should be opened and the ones to leeward should be closed
B.to leeward should be opened and the ones to windward should be closed
C.should be opened
D.should be closed
A.squaring the corners
B.rounding the corners
C.plug welding the corners
D.slot welding the corners
最新試題
The angle between the flukes and the shank of an anchor is called the().
The end of the joint with the exterior threads is called the().
The lines led forward from the bow and aft from the stern when a vessel is moored to the dock are().
Hatch No.1 must be cleaned up to meet the()of the cargo surveyors.
Should the vessel have no deratisation certificate at the time of her delivery,she()be held to be unseaworthy.
In order to withstand fluid head pressure on a ship,stiffeners are often attached to the bulkhead().
At()an occasional survey has been carried out.
At the same time,it is()for you to signify your acknowledgement of the responsibility for the collision by signing the copies of this letter hereto attached and to return me two copies in due time.
Please arrange the survey()early.
Please arrange()a surveyor to inspect the damaged bulkhead.