A.bow and stern lines
B.breast lines
C.halyards
D.warps
您可能感興趣的試卷
你可能感興趣的試題
A.pin
B.stem
C.box
D.stand
A.Certificate of Inspection
B.Classification Certificate
C.Load Line Certificate
D.Seaworthy Certificate
A.it
B.this
C.that
D.what
A.approves
B.alleges
C.allows
D.permits
A.foot
B.heel
C.step
D.sole
最新試題
Prior to burning or welding on a fuel tank on a ship,regulations require that an inspection be made. An entry in the unofficial logbook is required if this inspection is made by().
The burden of proving unseaworthiness is upon those who()it.
The boom stops are installed on an offshore crane to().
I saw the cargo surveyor()the cargo on deck just a minute ago.
Please arrange()a surveyor to inspect the damaged bulkhead.
Let’s submit the case() the cargo surveyor.
During fueling,all doors,hatches,and ports().
Sometimes it is desirable to connect a member both by riveting and welding. Which statement is TRUE concerning this procedure? ()
The above mentioned ship has been duly()in accordance with the provisions of the convention referred to.
Should the vessel have no deratisation certificate at the time of her delivery,she()be held to be unseaworthy.