A.relayed
B.delayed
C.conveyed
D.surveyed
您可能感興趣的試卷
你可能感興趣的試題
A.opposite directions on the same line,tending to pull the material apart
B.opposite directions on the same line,tending to compress the object
C.opposite directions along parallel lines
D.the same direction along parallel lines
A.Tearing through the member is more likely in this type connection
B.The weld may be broken by the stresses caused by riveting
C.The weld increases the tensile stress on the rivet heads
D.The welding must be completed before the riveting commences
A.shall
B.should
C.may
D.would
A.a marine chemist
B.the Officer in Charge,Marine Inspection
C.the Master or person in charge of the ship
D.the National Fire Protection Association
A.to be carried out
B.carry out
C.be carried out
D.will carry out
最新試題
The angle between the flukes and the shank of an anchor is called the().
The smallest size of flaw that can be detected on a radiograph examination of a weld will be indicated by the().
At least one reinspection shall be made on each vessel holding a Certificate of Inspection valid for two years. This inspection shall be held between the tenth and fourteenth months of the duration period of the certificate and shall be().
Connecting elements of a mooring system should be fabricated from().
Before welding can be done in a tank that has carried petroleum products,a certificate must be obtained from().
Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding().
At()an occasional survey has been carried out.
The boom stops are installed on an offshore crane to().
Let’s submit the case() the cargo surveyor.
In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the().