A.a marine chemist
B.the Officer in Charge,Marine Inspection
C.the Master or person in charge of the ship
D.the National Fire Protection Association
您可能感興趣的試卷
你可能感興趣的試題
A.to be carried out
B.carry out
C.be carried out
D.will carry out
A.of
B.for
C.with
D.in
A.18 months
B.2 years
C.3 years
D.5 years
A.to
B.of
C.for
D.about
A.The required oily-water separator malfunctions
B.The ship is transferred to Liberian registry
C.An annual survey is conducted fifteen months after the date of certificate issuance
D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
最新試題
The smallest size of flaw that can be detected on a radiograph examination of a weld will be indicated by the().
Should the vessel have no deratisation certificate at the time of her delivery,she()be held to be unseaworthy.
At least one reinspection shall be made on each vessel holding a Certificate of Inspection valid for two years. This inspection shall be held between the tenth and fourteenth months of the duration period of the certificate and shall be().
Hatch No.1 must be cleaned up to meet the()of the cargo surveyors.
The above mentioned ship has been duly()in accordance with the provisions of the convention referred to.
Connecting elements of a mooring system should be fabricated from().
Before welding in a tank that has carried petroleum products,the tank must be certified by ().
Sometimes it is desirable to connect a member both by riveting and welding. Which statement is TRUE concerning this procedure? ()
Chafing gear().
The document on a vessel,annually endorsed by an American Bureau of Shipping surveyor,is called the().