A.shall
B.should
C.may
D.would
您可能感興趣的試卷
你可能感興趣的試題
A.a marine chemist
B.the Officer in Charge,Marine Inspection
C.the Master or person in charge of the ship
D.the National Fire Protection Association
A.to be carried out
B.carry out
C.be carried out
D.will carry out
A.of
B.for
C.with
D.in
A.18 months
B.2 years
C.3 years
D.5 years
A.to
B.of
C.for
D.about
最新試題
The angle between the flukes and the shank of an anchor is called the().
Please arrange()a surveyor to inspect the damaged bulkhead.
The lines led forward from the bow and aft from the stern when a vessel is moored to the dock are().
Should the vessel have no deratisation certificate at the time of her delivery,she()be held to be unseaworthy.
Tensile stress is a result of two forces acting in().
Hatch No.1 must be cleaned up to meet the()of the cargo surveyors.
At()an occasional survey has been carried out.
Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding().
During fueling,all doors,hatches,and ports().
The bottom of the mast rests on a part of the keel called the mast().