單項選擇題The owner is not at liberty to leave the port of call as soon as the time specified in the charter-party has elapsed,though the Charterer may,if the contract so provides,be liable to compensate()for the delay.

A.the shipper
B.the owner
C.the consignor
D.the consignee


您可能感興趣的試卷

最新試題

The Charterers to have option of using Owners’ bunker contracts. This sentence indicates that().

題型:單項選擇題

That the Shipowner has broken a condition precedent will()the Charterer from the liability to provide a cargo.

題型:單項選擇題

Usually it will be()who will be liable for the payment of demurrage.

題型:單項選擇題

The owner is not at liberty to leave the port of call as soon as the time specified in the charter-party has elapsed,though the Charterer may,if the contract so provides,be liable to compensate()for the delay.

題型:單項選擇題

If the ship is delayed by reason of Charterer’s failure to name a port,()will be liable for the damages.

題型:單項選擇題

If the vessel is not discharged in the time stipulated in the charter-party,the Charterer renders()liable to pay demurrage or damages for detention,as the case may be.

題型:單項選擇題

In modern times,the work of stowage is generally deputed to stevedores,but that does not generally relieve the shipowners()their duties even though the stevedores are,under the charter-party,to be appointed by the Charterers.

題型:單項選擇題

To render the()liable,the shipowners must show that the proximate cause of the detention or expense was trading to a river with a bar or to a port with a bar.

題型:單項選擇題

The right to limit liability in connection with the ship()also extended to Charterers and any person interested in or in possession of the vessel and,in particular,any manager or operator of her.

題型:單項選擇題

The final inspection responsibility for seeing that a tank barge is provided with the required equipment and fittings in good and serviceable condition prior to loading cargo rests with the ().

題型:單項選擇題