A.the shipper
B.the owner
C.the consignor
D.the consignee
您可能感興趣的試卷
你可能感興趣的試題
A.the Charterer
B.the Shipowner
C.the shipper
D.the cargo owner
A.with
B.for
C.by
D.to
A.has
B.have
C.is
D.are
A.takes
B.comes
C.goes
D.gives
A.terminal operator
B.owner of the barge
C.tankerman or person in charge of loading
D.charterer through the Master of the towing vessel
最新試題
The Charterers to have option of using Owners’ bunker contracts. This sentence indicates that().
That the Shipowner has broken a condition precedent will()the Charterer from the liability to provide a cargo.
Usually it will be()who will be liable for the payment of demurrage.
The owner is not at liberty to leave the port of call as soon as the time specified in the charter-party has elapsed,though the Charterer may,if the contract so provides,be liable to compensate()for the delay.
If the ship is delayed by reason of Charterer’s failure to name a port,()will be liable for the damages.
If the vessel is not discharged in the time stipulated in the charter-party,the Charterer renders()liable to pay demurrage or damages for detention,as the case may be.
In modern times,the work of stowage is generally deputed to stevedores,but that does not generally relieve the shipowners()their duties even though the stevedores are,under the charter-party,to be appointed by the Charterers.
To render the()liable,the shipowners must show that the proximate cause of the detention or expense was trading to a river with a bar or to a port with a bar.
The right to limit liability in connection with the ship()also extended to Charterers and any person interested in or in possession of the vessel and,in particular,any manager or operator of her.
The final inspection responsibility for seeing that a tank barge is provided with the required equipment and fittings in good and serviceable condition prior to loading cargo rests with the ().