單項選擇題Which action(s) is/are included in crane operations?()

A.Normal boom stowage and shutdown operations
B.Emergency shutdown operation
C.Removing booms from stowage
D.All of the above


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題Where must the 0mster or person in charge of a ship record the date of each test of emergency lighting and power systems and the condition and performance of the equipment?()

A.On the Certificate of Inspection
B.On the Muster List ("Station Bill")
C.In the Operations Manual
D.In either the official or unofficial log

2.單項選擇題When will the float-free emergency position indicating radio beacon be activated after abandoning ship?()

A.Immediately after floating free
B.After about one hour when the salt water activates the battery
C.Only when keyed by the radar of another vessel
D.Only when daylight activates the photovoltaic cell

3.單項選擇題When should the emergency position-indicating radio beacon be activated after abandoning an OSV?()

A.Immediately
B.After one hour
C.Only when another vessel is in sight
D.Only after sunset

4.單項選擇題When hanging off drill pipe in emergency situations aboard a ship,the preferred location of the drill bit is().

A.on bottom with the full drill string in tension
B.one stand (approximately 93 feet) off bottom
C.no deeper than the shoe of the last casing set
D.as close to the surface as possible

5.單項選擇題When amendments are made to the Shipboard Oil Pollution Emergency Plan,the revisions must be submitted to the Coast Guard().

A.one month before the anniversary date of the plan
B.six months before the end of the approval period
C.and cannot be implemented without approval
D.and can be implemented without immediate approval as long as final approval is received within six months of submission