A.decks
B.cabins
C.holds
D.positions
您可能感興趣的試卷
你可能感興趣的試題
A.gross tonnage
B.deadweight space
C.bale cubic
D.stowage area
A.amount of chain lying along the bottom increases
B.length of the catenary is reduced
C.mooring line tension is increased
D.amount of chain lying along the bottom decreases
A.crane pedestal
B.wire-rope locker
C.main deck
D.crane controls
A.to
B.in
C.on
D.with
A.deck edge immersion
B.the load line
C.downflooding
D.loll
最新試題
When lowering lifeboats in heavy seas,a good practice is to rig frapping lines().
What is TRUE about hoisting operations?()
The usual method of arranging a line on deck so that it will run out easily without kinking or fouling is().
The purpose of the tripping line on a sea anchor is to().
The margin plate is the().
What is TRUE about hoisting operations().
Any Works completion date quoted by the Repairer is an estimate only and the Repairer shall not be()liable for any failure to complete the Works by that date.
When hoisting a boat on gravity type davits using an electric motor driven winch,the davit arms should be brought up().
The vessel or other goods upon which the Works have been carried out must be()from the Repairer’s worksite within 3 days after the invoice date or in accordance with other written notification by the Repairer to the Customer.
Solid waste generation,and electricity and water consumption are costly and have their own set of environmental().