A.eliminates confusion with the final stowage plan
B.shows the approximate amount of cargo to be loaded in each hold
C.expedites the total operation
D.requires an unproportional number of gang hours of work to discharge the cargo
您可能感興趣的試卷
你可能感興趣的試題
A.loading
B.leaving
C.arriving
D.sailing
A.of working gangs
B.of idle time
C.in productivity of the working shifts
D.of working hours each working day
A.IBC code
B.BC code
C.IMDG code
D.IGC code
A.strips of burlap
B.heavy paper
C.dunnage boards
D.strips of rope yarm
A.below
B.in
C.of
D.under
最新試題
()is halfway between the forward and after perpendiculars and is reference point for vessel construction.
The loading of the ship must be done in accordance with().
When the wave period and the apparent rolling period are the same().
When steering by autopilot,how often should the steering be checked?()
Where would you find information about the time of high tide at a specific location on a particular day of the year?()
Shipboard Emergency Drills must be carried out at least()on board cargo ship.
Your vessel is docking, but not yet alongside. Which line will be the most useful when maneuvering the vessel alongside the pier?().
The helm command PORT TWENTY means().
The circulation around a low pressure center in the Northern Hemisphere is().
Manoeuvring information can not be obtained from().