A.CoD and PCI hot-plug
B.DLPAR and Active Memory Sharing
C.Hot node add and hot node repair
D.D.ynamic processor failure and processor instruction retry
您可能感興趣的試卷
你可能感興趣的試題
A.Enable automatic problem reporting from smit
B.Use IVM to enable console mirroring to IBM Remote Support.
C.Use the HMC to enable reporting through Electronic Service Agent.
D.Enable Automatic Problem Reporting in ASMI using he embedded modem on the FSP.
A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions.
What is needed to read the exported system plan and design the new system?()
A.e-Config
B.System Planning Tool (SPT)
C.IBM Workload Estimator (WLE)
D.IBM Performance Monitor (PM)
A.0.80
B.0.16
C.1.60
D.0.10
A.Parallel and Serial
B.Serial and Asynchronous
C.Parallel and Synchronous
D.Synchronous and Asynchronous
A customer has several single partition POWER5 and POWER6 processor-based systems housed in regional data centers and wants to consolidate into a single Power 770. They must minimize overall cost and the number of adapters, while ensuring a reliable infrastructure.
Which solution addresses the customer requirements?()
A.Move the storage into a common SAN and virtualize the I/O using a single VIO Server with dual NIC connectors and dual HBAs
B.Move the existing physical network and storage adapters to the new system and virtualize the I/O using a single VIO Server.
C.Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, each with dual NIC connectors and dual HBAs.
D.Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, one with dual NIC connectors and the other with dual HBAs.
最新試題
A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750.Which action allows the most efficient use of existing equipment?()
Which system provides the highest performance per core, and the least cost for applications licensed per core?()
Using the following information: Performance data from an existing system that a new system will replace; Performance estimates that anticipate future workloads; Micro-partitioning and logical partitioning implementations.Which of the following allows a technical sales representative to create a system design which can be imported into an HMC?()
A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware.Which of the following meets these requirements?()
A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance.Which of the following solutions will help the customer with this issue for the least cost and with the least interruption?()
A retail customer has an 8-core Power 740 server with 2 partitions. Production has 4 dedicated cores and the test partition has 2 dedicated cores. Both partitions run during the day without problems. At night, batch processing is exceeding the run window.Which solution addresses this problem without requiring additional hardware?()
A Power 720 customer using IVM wants to implement dual VIO servers, but is unable to create the second server. What is the most likely reason for this?()
Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager (AEM) in a data center with high energy utilization?()
A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()
An end user is deploying Blade servers to replace obsolete rack mounted servers. In addition to AIX Web server and database workloads, they also have Windows workloads.Which Blade is designed for Windows workloads?()