A.bow stem
B.stern
C.portside
D.starboard side
您可能感興趣的試卷
你可能感興趣的試題
A.after torque causes line pull to exceed the rated capacity of the winch
B.before the line pull reaches the rated capacity of the winch
C.when the line pull reaches the breaking strength of the fall
D.before the safe working load of the fall is reached
A.install shoring so the shoring supports the damaged bulkheads without pushing on them
B.install shoring so that it pushes on the damaged bulkhead while supporting it
C.use jacks or chain falls to remove the set before installing shores
D.place sandbags by the bulkhead without installing shores
A.triangular-shaped plates connecting the bull chain to the topping lift
B.metal plates secured over the tops of the hawsepipes
C.faired shell plates with curvature in two directions
D.sheets of dunnage used to prevent heavy cargo from buckling the deck plates
A.assist in drydock alignment
B.improve the vessel's stability
C.protect the vessel from slamming against piers
D.reduce the rolling of the vessel
A.deeply-grooved drum on the windlass with sprockets which engage the links of the anchor chain
B.winch that is running out of control due to a failure of the overspeed trips
C.line that has jumped off the gypsyhead while under strain
D.nylon line that parts under strain and whips back in a hazardous manner
最新試題
Pollution regulations require that each scupper in an enclosed deck area have a().
Regulations require that access to a cargo pumproom in a tanker carrying grade D liquid cargo,shall be().
Buckler plates are().
Grinding to eliminate shallow surface defects should be done().
The Tonnage Certificate indicates().
A single fitting installed in a pipeline that either blanks off the pipe or allows a full flow passage of a liquid through the pipe is referred to as a().
Ship’s steering gear refers to().
In vessel construction,a greater number of watertight bulkheads results in().
Shell plating is().
Freeboard is measured from the upper edge of the().