A.in the loading place
B.in the port or dock
C.in the loading spot
D.in the discharging spot
您可能感興趣的試卷
你可能感興趣的試題
A.he
B.she
C.the owner
D.the shipper
A.broken space
B.dead weight
C.constant
D.dead freight
A.a part of
B.the whole
C.3/4th of
D.1/2nd of
A.by the weight (tons) of cargo
B.by the capacity (tons) of vessel
C.by DW of the vessel
D.by the draft of the vessel
A.chartering
B.dispatching
C.fixing
D.tendering
最新試題
The carrier has,before and at the beginning of the voyage,to()due diligence to make the ship seaworthy.
A charter-party usually contains a clause stating that the master is to be under the orders of the()as regards employment,agency or other arrangements.
If the Charterer nominates an unsafe port and the ship is damaged through going there,() will be liable for the damage,subject to that the master acts reasonably in going there.
Both the Shipowner and the Charterer will be discharged from their obligations under the charter-party if it()frustrated.
Where a propeller shaft passes through the hull,water is prevented from entering by means of a().
Freight rates are mostly charged().
According to Gencon,if at any time during the currency of this Charter,both Owners and Charterers are unable to arrange bunkers at the main bunkering ports for the voyage in question,the()to have the privilege of canceling this Charter.
The carrier can obtain()for loss caused to him by the shipper stating the particulars of the goods inaccurately.
Delivery of a vessel to a charterer is called().
If the state of the goods at the time they were handed over to the consignee has been the subjectof a joint survey or inspection by the parties,notice in writing()be given of loss or damage ascertained during such survey or inspection.