單項(xiàng)選擇題Where a propeller shaft passes through the hull,water is prevented from entering by means of a().

A.stuffing box
B.propeller boss
C.seacock
D.stop-water


您可能感興趣的試卷

你可能感興趣的試題

3.單項(xiàng)選擇題When the Captain of the Port or Officer in Charge,Marine Inspection issues an order of suspension to the operator of a vessel concerning oil transfer operations,it().

A.is always effective immediately
B.includes a statement of each condition requiring corrective action
C.must be in writing before it takes effect
D.All of the above

4.單項(xiàng)選擇題The object of the both-to-blame collision clause is().

A.to free the carrying ship from liability
B.to free the non-carrying ship from liability
C.to free the ship in the wrong from liability
D.to free the ship not to blame from liability

最新試題

The merchant undertakes that no claim or allegation shall be made against any servant,agent or subcontractor of the carrier which()to impose upon any of them or any liability whatsoever in connection with the goods.

題型:?jiǎn)雾?xiàng)選擇題

A charter-party usually contains a clause stating that the master is to be under the orders of the()as regards employment,agency or other arrangements.

題型:?jiǎn)雾?xiàng)選擇題

A vessel is not in every way fitted for cargo service()at the time of her delivery to the charterers her engine room staff is incompetent and inadequate,and accordingly she is unseaworthy.

題型:?jiǎn)雾?xiàng)選擇題

If a full cargo is not loaded,the Charterer must pay not only freight on the goods actually shipped but also().

題型:?jiǎn)雾?xiàng)選擇題

A breach of the()undertaking of seaworthiness at the port of loading entitles the Charterer to refuse to load.

題型:?jiǎn)雾?xiàng)選擇題

Where a charter-party stated that errors of navigation were excluded,it was held that these words referred to non-negligent errors,and()not wide enough to embrace negligent errors.

題型:?jiǎn)雾?xiàng)選擇題

The carrier can obtain()for loss caused to him by the shipper stating the particulars of the goods inaccurately.

題型:?jiǎn)雾?xiàng)選擇題

If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.

題型:?jiǎn)雾?xiàng)選擇題

()the Charterer seeks to say that the contract has been frustrated or that there has been an anticipatory breach which entitles him to rescind,then he has such rights as are given him at common law.

題型:?jiǎn)雾?xiàng)選擇題

The carrier is entitled to()overboard goods which are dangerous.

題型:?jiǎn)雾?xiàng)選擇題