A.first stage flash chamber
B.second stage flash chamber
C.first stage after condenser
D.second stage distilling condenser
您可能感興趣的試卷
你可能感興趣的試題
A.system is low on refrigerant
B.high pressure cutout switch is improperly adjusted
C.discharge valves are leaking slightly
D.discharge valves are leaking excessively
A.leaky discharge valves on the LP cylinder
B.leaky discharge valves on the HP cylinder
C.insufficient intercooler cooling
D.low ambient air pressure
A.one size larger than the pump discharge nozzle
B.the same size as the pump discharge nozzle
C.one size smaller than the pump discharge nozzle
D.installed with a short radius elbow at the pump
A.purge the condenser if the waterside is dirty
B.check for proper water flow through the condenser
C.increase the high pressure cutout setting
D.reduce the cooling water flow
A.Red
B.White
C.Blue
D.Yellow
最新試題
Which of the following statements is correct concerning heat transfer?()
The rate of heat transfer between the hot and cold fluids passing through a shell-and-tube type heat exchanger will ().
The temperature differential occurring between the inlet temperature of the fluid to be cooled and the outlet temperature of the cooling medium in a shell-and-tube heat exchanger is greatest in which of the flow designs listed?()
A gradual decrease in the discharge pressure of an operating hydraulic pump can be caused by ().
Which of the following problems could cause the high pressure cutout switch to shut down the compressor in a refrigeration system?()
Who is responsible for ensuring that someone is assigned to close the watertight doors in an emergency?()
An internal bypass is provided on some hydraulic system suction strainers to help reduce the possibility of ().
When a refrigeration compressor has developed a high head pressure as a result of a refrigerant overcharge, you should ().
A grease gun is generally used to lubricate a ().
One cause of high head pressure occurring in a refrigeration system can be ().