A.supplies or attempts to supply
B.imposes or attempts
C.complies or attempts to comply
D.provides or attempts to provide
您可能感興趣的試卷
你可能感興趣的試題
A.packing,marking
B.pack,mark
C.packed,marked
D.be packed,be marked
A.to be seaworthy
B.being seaworthy
C.be seaworthy
D.seaworthy
A.though
B.thought
C.throw
D.through
A.pay
B.export
C.import
D.exercise
A.an indemnity
B.liability
C.responsibility
D.possibility
最新試題
If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
A vessel is not in every way fitted for cargo service()at the time of her delivery to the charterers her engine room staff is incompetent and inadequate,and accordingly she is unseaworthy.
()is not within the exception of the perils of the sea.
Where a propeller shaft passes through the hull,water is prevented from entering by means of a().
()the Charterer seeks to say that the contract has been frustrated or that there has been an anticipatory breach which entitles him to rescind,then he has such rights as are given him at common law.
Freight rates are mostly charged().
When the Captain of the Port or Officer in Charge,Marine Inspection issues an order of suspension to the operator of a vessel concerning oil transfer operations,it().
Where a charter-party stated that errors of navigation were excluded,it was held that these words referred to non-negligent errors,and()not wide enough to embrace negligent errors.
The merchant undertakes that no claim or allegation shall be made against any servant,agent or subcontractor of the carrier which()to impose upon any of them or any liability whatsoever in connection with the goods.
Delivery of a vessel to a charterer is called().