A.only when the cargo is within its rail
B.during the time when loading or unloading is going on
C.after the cargo is checked by tallymen
D.as soon as loading or discharging begins
您可能感興趣的試卷
你可能感興趣的試題
A.advance freight
B.back freight
C.dead freight
D.pro rata freight
A.Guy failures
B.Topping lift failures
C.Bending of the boom from compression
D.Gooseneck failure
A.is capable of bringing
B.is sufficient to bring
C.is not capable of bringing
D.is probally to bring
A.ships arrive at random
B.cargo-handling time varies greatly
C.ships have to queue to get onto berths
D.ships do not have to wait to get onto berths
A.breakdown
B.breaked down
C.broken down
D.broke down
最新試題
The cargo fall over the dock is called the().
()is not an advice be observed when samples are taken in tanks containing volatile petroleum products.
Please shift some light cargo to fill it().
Which statement is TRUE concerning the gooseneck().
Draft readings shall be considered as()in the draft survey report.
Please arrange for the workers to do the()work during loading the trucks and heavy cargo on the ship,and also supply the necessary materials for the work.
What is the minimum standard for making an eye splice in a wire to be used as cargo gear().
You are transporting dangerous cargo on your vessel.You must inspect this cargo().
The force acting on a single cargo runner which is vertically lifting or lowering a load is greatest when().
Therefore you are requested to arrange()for the above mentioned amount of additional cargo to be loaded on board.