單項(xiàng)選擇題All these containers will be loaded()deck.

A.in
B.up
C.above
D.on


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題The average of the forward and after drafts is the().

A.mean draft
B.true mean draft
C.mean of the calculated drafts
D.draft at the center of flotation

2.單項(xiàng)選擇題On a vessel,multiplying a load’s weight by the distance of the load’s center of gravity above the baseline results in a(n)().

A.transverse moment
B.vertical moment
C.righting moment
D.inclining moment

4.單項(xiàng)選擇題Owing to the big draft,the ship is not permitted to go alongside until the time of().

A.ebb tide
B.flood tide
C.spring tide
D.slack water

5.單項(xiàng)選擇題On the cargo manifest,the gross weight of a box containing cargo is the weight of the().

A.cargo
B.box
C.cargo and box
D.rate weight

6.單項(xiàng)選擇題The controlling depth of the river is().

A.the minimum depth of the river prescribed in the channel maintenance program
B.the edge of a dredged channel
C.the highest level to which the river may rise without flooding
D.the least available water in a channel which limits the draft of boats and tows

7.單項(xiàng)選擇題Reserve buoyancy is().

A.also called GM
B.the void portion of the ship below the waterline which is enclosed and watertight
C.affected by the number of transverse watertight bulkheads
D.the watertight portion of a vessel above the waterline

8.單項(xiàng)選擇題Although KG for a ship in lightweight is relatively high,the vessel is stiff because().

A.KM is small
B.KM is high
C.BL is small
D.KB is large

9.單項(xiàng)選擇題The difference between the initial trim and the trim after loading is known as().

A.trim
B.change of trim
C.final trim
D.change of draft

10.單項(xiàng)選擇題Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in().

A.INTERNATIONAL LOAD LINE CERTIFICATE
B.PASSENGER SHIP SAFETY CERTIFICATE
C.CARGO SHIP SAFETY CONSTRUCTION CERTIFICATE
D.GENERAL DECLARATION